Transportation (CUUATS)

Long Range Transportation Plan (LRTP) 2025

CUUATS

CUUATS approved the updated LRTP 2035 in December 2009.  For more information on the LRTP 2035 process please visit the website.

  • If you have a dial-up connection, we recommend you request a CD of the document; call (217) 328-3313 to request a free copy.
  • All documents are in PDF format (Adobe Acrobat or Acrobat Reader required).
  • All documents are formatted for double sided printing if desired.

Main Report

Maps

Many maps can be found in the document; the following maps are inserts. All maps are size 17 x 11.

II-3 Map: Land Use
II-4 Map: Functional Classification
IV-1 Map: Existing Transportation System
IV-2 Map: Selected Crash Intersection Locations 1999-2002
IV-5 Map: 2001 Average Daily Traffic Ranges
IV-6 Map: Intersections with > 20000 ADT
IV-7 Map: Major Traffic Generators
IV-8 Map: PM Peak Intersection Level of Service
IV-9 Map: Champaign-Urbana-Savoy Greenways and Trails 2004
IV-12  Map: 2001 Average Daily Truck Traffic Volumes
IX-1 Map: Preferred Alternative
X-1 Map: TIP and CIP projects
X-2 Map: Congested Corridors 2025
X-3 Map: Financially Constrained Greenways and Trails Projects
X-4 Map: How far does the funding go?

Appendices